i. This Monthly Environmental Monitoring and Audit (EM&A)
Report is prepared for Contract No. SPW 07/2020 ¡§Environmental Team for
Construction of Yuen Long Effluent Polishing Plant Stage 1¡¨. Drainage Services
Department (DSD) has appointed Fugro Technical Services Limited (FTS) to
undertake the Environmental Team services for the project and implement the
EM&A works.
ii.
This is the 4th Monthly
EM&A Report for the Contract which summaries findings of the EM&A programme
during the reporting period from 1 July 2021 to 31 July 2021. As informed by
the Contractor, major activities in the reporting month were:
¡P
Pre-drill
work at Primary Sedimentation Tanks (PST) by 3 drill rigs;
¡P
Site
formation works at Primary Sedimentation Tanks (PST) no. 7 & 8;
¡P
Breaking
of Primary Sedimentation Tanks (PST) no. 8;
¡P
Sheet
pile installation works for Zone 2A diversion;
¡P
Driven
H-pile at Inlet Works (IW) stage 1, 2 and Primary Sedimentation
Tanks by 3
rigs;
¡P
Demolition
of workshop and changing room by crusher and breaker;
¡P
Demolition
of carparks
¡P
Trial
pit for Zone 2B & 3 diversion;
¡P
Removal
of sludge from sludge holding tanks; and
¡P
Overhaul
work at Final Sedimentation Tanks (FST).
Breaches of Action and Limit Levels
iii.
No Action and Limit Level
exceedance was recorded for air quality monitoring and construction noise
monitoring in the reporting month.
iv.
Three Limit Level
exceedance were recorded for water quality in the reporting month. The
exceedance were recorded at M1 on 3, 6 and 27 July 2021. It was found that
these exceedances were not project-related.
v.
No Action / Limit exceedance was recorded for noise levels at
stations (NMS1 and NMS2) in close proximity to the active ardeid night roost.
One active ardeid night roost site (ANR1) was observed within the Survey Area
during the July 2021 monitoring period, while the other night roost site (ANR2)
was not currently used by the ardeids.
Complaint Log
vii.
No complaints were
received in the reporting period.
Notifications
of any Summons and Successful Prosecutions
viii.
No notifications of
summons and prosecutions were received in the reporting period.
Reporting Change
ix.
There were no reporting
changes during the reporting month.
Future Key Issues
x.
The main works will be
anticipated in the next three months are as follow:
¡P
Pre-drill
work at Zone 2;
¡P
Demolition
of Sludge Holding Tanks, Detritor 3C & Flow Meter Chamber;
¡P
Demolition
of carpark;
¡P
Demolition
of Final Sedimentation Tanks (FST) no. 7&8;
¡P
Demolition
of Primary Sedimentation Tanks (PST) no. 5&6;
¡P
Demolition
of waste storage area;
¡P
Sheet
pile installation at Aeration Tank, Inlet Works (IW) & Primary
Sedimentation Tanks (PST);
¡P
Driven
H-pile at Inlet Works (IW) & Primary Sedimentation Tanks (PST);
¡P
Zone
2 & 3 diversion work;
¡P
Enviro.
GI at Waste Storage Area & Air Floatation Thickener;
¡P
Removal
of Sonneratia; and
¡P
Installation
of instrumentation at Zone 2 & 3.
8. ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE
9. IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION
MEASURE
Tables
Table 1.1 Contact Information of Key Personnel
Table 1.2
Environmental Licenses, Notification and Permits Summary
Table 2.1
Air Quality Monitoring Equipment
Table 2.2
Air Quality Monitoring Location
Table 2.3 Summary of Air
Quality Monitoring Results
Table 2.4 Comparison of 1-hr
TSP data with EIA predictions
Table 3.1
Construction Noise Monitoring Equipment
Table
3.2 Monitoring Parameters and Frequencies of Noise Monitoring
Table 3.3
Construction Noise Monitoring Location
Table 3.4
Summary of Construction Noise Monitoring Results
Table
3.5 Comparison of Noise monitoring data with EIA predictions
Table
4.1 Water Quality Monitoring and
Sampling Equipment
Table
4.2 Monitoring Parameters and
Frequency
Table 4.3
Coordinates of Water Quality Monitoring Locations
Table
4.4 Summary of Water Quality Exceedance
Table
5.1 Noise Monitoring Parameters (For Active Ardeid Night Roost Survey)
Table
5.2 Active Ardeid Night Roost Survey Findings
Table
5.3 Noise Monitoring Results (For Active Ardeid Night Roost Survey)
Table
5.4 Noise Monitoring Parameters
Table
5.5 Abundance of all Avifauna Species
Table
5.6 Abundance of Species of Conservation Importance
Table
5.7 Shannon Diversity Index Value of all Avifauna Species
Table
5.8 Shannon Diversity Index Value of Species with Conservation Importance
Table
5.9 Wetland habitat utilization of all avifauna species
Table
5.10 Wetland habitat utilization of conservation importance
Table
5.11 Noise Monitoring Results (For Ecological Monitoring of Birds)
Table 7.1 ¡V Waste Generated by the Construction and Disposal Ground
Figures
Figure 1 Location of Proposed Yuen Long Effluent Polishing Plant
Figure 2 Air Quality Monitoring Locations
Figure 3 Noise Monitoring Locations
Appendices
Appendix A Construction
Programme
Appendix B Project
Organization Chart
Appendix C Action
and Limit Levels
Appendix D Calibration
Certificate of Monitoring Equipment
Appendix E Environmental
Monitoring Schedule
Appendix H Event
and Action Plan
Appendix J Implementation
Status of Environment Mitigation Measures
Appendix K Weather
and Meteorological Conditions
Appendix M Summary
of Observations and Findings in the Reporting Month
Appendix N Outstanding
Issues and Deficiencies
Appendix O Active
Night Roost Monitoring Area and Vantage Points; and Noise Monitoring Stations
Appendix P Ecological
Bird Monitoring Area with Locations of Point Count Sites and Transect Route